Engine Routing and Scheduling at Industrial In-Plant Railroads

@article{Lbbecke2003EngineRA,
  title={Engine Routing and Scheduling at Industrial In-Plant Railroads},
  author={Marco E. L{\"u}bbecke and Uwe T. Zimmermann},
  journal={Transportation Science},
  year={2003},
  volume={37},
  pages={183-197}
}
In-plant railroad engine scheduling involves routing and scheduling decisions for a heterogeneous fleet of switching engines to serve a set of time-windowand capacity-constrained transportation requests. Despite an ever-increasing competition, the current planning is purely by pencil and paper. Our paper describes the mathematical and algorithmic developments for addressing in-plant railroad decision support for scheduling and routing. The problem discussed in our work is related to the… CONTINUE READING

Citations

Publications citing this paper.
Showing 1-10 of 18 extracted citations

References

Publications referenced by this paper.
Showing 1-10 of 16 references

Accelerating strategies in column generation methods for vehicle routing and crew scheduling problems

  • G. Desaulniers, J. Desrosiers, M. M. Solomon.
  • C. C. Ribeiro, P. Hansen, eds. Essays and Surveys…
  • 2001
Highly Influential
3 Excerpts

Engine scheduling by column generation

  • U. T. Zimmermann
  • Ph.D. thesis, Braunschweig University of…
  • 2001

A unified framework for deterministic time constrained vehicle routing and crew scheduling problems

  • I. Ioachim, M. M. Solomon, F. Soumis, D. Villeneuve
  • eds. Fleet Management and Logistics. Kluwer,
  • 1998

A generalized permanent labelling algorithm for the shortest path problem with time windows

  • M. Desrochers, F. Soumis.
  • INFOR 26 191–212. , . 1988b. A reoptimization…
  • 1988

The shortest path problem for the construction of vehicle routes with pick-up, delivery and time

  • J Desrosiers, Y. Dumas
  • 1988

Similar Papers

Loading similar papers…