Employing use cases to early estimate effort with simpler metrics

@article{Robiolo2007EmployingUC,
  title={Employing use cases to early estimate effort with simpler metrics},
  author={Gabriela Robiolo and Ricardo Orosco},
  journal={Innovations in Systems and Software Engineering},
  year={2007},
  volume={4},
  pages={31-43}
}
In order to calculate size and to estimate effort in applications, the standard method most usually used is function points, which has been used with good results in the development of industrial software for some time. However, some aspects should be improved, namely: the time at which the estimation of effort is performed and the margin of error in the effort estimation. Consequently, another size metric which could be used to obtain more accurate estimations should be found. This article… CONTINUE READING
Highly Cited
This paper has 55 citations. REVIEW CITATIONS

From This Paper

Figures, tables, results, connections, and topics extracted from this paper.
27 Extracted Citations
17 Extracted References
Similar Papers

Citing Papers

Publications influenced by this paper.
Showing 1-10 of 27 extracted citations

55 Citations

051015'09'11'13'15'17
Citations per Year
Semantic Scholar estimates that this publication has 55 citations based on the available data.

See our FAQ for additional information.

Referenced Papers

Publications referenced by this paper.
Showing 1-10 of 17 references

Metrics for Objectory

  • G Karner
  • Diploma Thesis,
  • 1993
Highly Influential
5 Excerpts

Early & quick function point: sizing more with less

  • L Santillo, R Conte Mand Meli
  • IEEE international software metrics symposium,
  • 2005
1 Excerpt

Similar Papers

Loading similar papers…