Production scheduling plays a crucial role in the prefabricated construction productivity and on-time delivery of precast components (PCs). However, previous studies mainly focused on the static scheduling of single production line without considering the demand variability in practice. To achieve dynamic production planning, a Two-level Rescheduling Model for Precast Production with multiple production lines is developed to minimise the rescheduling costs based on genetic algorithm, from the… CONTINUE READING