Due Date Management Policies

@inproceedings{Keskinocak2003DueDM,
  title={Due Date Management Policies},
  author={P{\~o}nar Keskinocak and Sridhar Tayur},
  year={2003}
}

From This Paper

Figures and tables from this paper.

Citations

Publications citing this paper.
Showing 1-10 of 37 extracted citations

Dynamic appointment scheduling with wait-dependent abandonment

European Journal of Operational Research • 2018
View 1 Excerpt

A framework for effective shop floor control in wafer fabs

2015 Winter Simulation Conference (WSC) • 2015
View 1 Excerpt

References

Publications referenced by this paper.
Showing 1-10 of 108 references

Asymptotically optimal algorithms for reliable due date scheduling

P. Kaminsky, Z.-H. Lee
Technical report, Department of Industrial Engineering and Operations Research, University of California, Berkeley, CA, • 2003
View 5 Excerpts
Highly Influenced

Optimal lead time policies

M. L. Spearman, R. Q. Zhang
Management Science, 45(2):290—295, • 1999
View 4 Excerpts
Highly Influenced

Price, delivery time guarantees and capacity selection

European Journal of Operational Research • 1998
View 9 Excerpts
Highly Influenced

Job shop lead time requirements under conditions of controlled delivery performance

S. T. Enns
European Journal of Operational Research, 77:429—439, • 1994
View 19 Excerpts
Highly Influenced

An investigation of due-date assignment using workload information of a dynamic shop

G. Udo
International Journal of Production Economics, 29:89—101, • 1993
View 8 Excerpts
Highly Influenced

Due date assignment in a multistage job shop

T. D Fry, P. R. Philipoom, R. E. Markland
IIE Transactions, pages 153—161, June • 1989
View 9 Excerpts
Highly Influenced

Approximations for the time spent in a dynamic job shop with applications to due-date assignment

J. G. Shantikumar, U. Sumita
International Journal of Production Research, 26(8):1329— 1352, • 1988
View 4 Excerpts
Highly Influenced

A comparison of due-date selection rules

K. R. Baker, J.W.M. Bertrand
AIIE Transactions, • 1981
View 13 Excerpts
Highly Influenced

Due date assignment for production systems

A. Seidmann, M. L. Smith
Management Science, 27(5):571—581, • 1981
View 10 Excerpts
Highly Influenced

Similar Papers

Loading similar papers…