Determining the best sequence of load pickup during power system restoration

Abstract

The first control action in power system restoration concerns the generation restart. In the initial phase of restoration, operators are often concerned with load pickup problems. One of the important problems during load pickup is keeping frequency response in allowable range. The aim of this paper is to determine the best sequence of load pickup by hydro… (More)

6 Figures and Tables

Topics

  • Presentations referencing similar topics