Designing and modeling the integrated bus and driver scheduling problem

This paper discussed the necessity and advantages of scheduling buses and their drivers simultaneously whilst indicating the limitations of the traditional two-stage sequential scheduling approach on dealing with the closely associated constraints enforced on buses and their drivers. A framework based on the minimum cost network flow was established, in… CONTINUE READING