Deliverable Cs5.1: Report on Vhs Case Study 5: Sidmar Steel Plant at Ghent, Belgium Introduction Presentation of the Case

    Abstract

    CS5 was included in the project as an example of an industrial plant where a realistic scheduling and resource allocation problem is solved. The plant model and the speciications to be met by the plant operation include both purely logical as well as hard real-time constraints. The size of the plant is not execssively large, but the number of states is… (More)

    Topics

    Cite this paper

    @inproceedings{DeliverableCR, title={Deliverable Cs5.1: Report on Vhs Case Study 5: Sidmar Steel Plant at Ghent, Belgium Introduction Presentation of the Case}, author={} }