Coordinative production and maintenance scheduling problem with flexible maintenance time intervals

Abstract

Sorry, we couldn't extract an abstract for this paper.
DOI: 10.1007/s10845-014-1001-9

Topics

Figures and Tables

Sorry, we couldn't extract any figures or tables for this paper.

Slides referencing similar topics