Controlling Cost Overrun Factors in Construction Projects in Malaysia

@article{Asmi2013ControllingCO,
  title={Controlling Cost Overrun Factors in Construction Projects in Malaysia},
  author={A. Asmi and A. Azis and A. Memon and I. A. Rahman and Onn Malaysia},
  journal={Research Journal of Applied Sciences, Engineering and Technology},
  year={2013},
  volume={5},
  pages={2621-2629}
}
  • A. Asmi, A. Azis, +2 authors Onn Malaysia
  • Published 2013
  • Engineering
  • Research Journal of Applied Sciences, Engineering and Technology
Poor cost performance in construction project is a common problem worldwide resulting in significant amount of cost overrun. This led us to explore the major contributors of cost overrun and propose mitigation measures to control cost overrun factors. Since, there were very few studies on cost issues in construction projects in Malaysia, hence this study was carried out in Malaysia using qualitative research method using semi-structured interview with experienced personnel's involved in… Expand
40 Citations

Tables from this paper

Avoiding Cost Overruns in Construction Projects in India
  • 19
  • Highly Influenced
  • PDF
Causes of Construction Projects Cost Overrun in Brazil
  • 6
Analyzing Causes of Delay in Construction Projects
  • 2
  • PDF
...
1
2
3
4
...

References

SHOWING 1-10 OF 32 REFERENCES
Cost and time control of construction projects: inhibiting factors and mitigating measures in practice
  • 317
  • Highly Influential
  • PDF
Dealing with cost and time in the Portuguese construction industry
  • 42
  • PDF
Delays and cost overruns in the construction projects in the Gaza Strip
  • 209
...
1
2
3
4
...