Consolidation of the IFM with the JSSP through Neural Networks as Model for Software Projects

Abstract

This paper proposes a consolidation of the Incremental Funding Method (IFM) with the Job Shop Scheduling Problem (JSSP) through Neural Networks, in order to develop a model for software projects. More specifically, it formulates the IFM method in terms of JSSP model and then gives a solution method based on Recurrent Neural Networks (RRNs). The IFM is a… (More)

4 Figures and Tables

Topics

  • Presentations referencing similar topics