Class-Based Control Schemes for Parameterized Project Scheduling Heuristics

@inproceedings{Schirmer1998ClassBasedCS,
  title={Class-Based Control Schemes for Parameterized Project Scheduling Heuristics},
  author={Schirmer},
  year={1998}
}
Highly Cited
This paper has 18 citations. REVIEW CITATIONS

References

Publications referenced by this paper.
Showing 1-10 of 16 references

Sequential - analysis based randomizedregretmethods for lotsizing and scheduling "

D. S. J OHNSON
Journal of the Operational Research Society • 1996

Nonpreemptive multi - mode resourceconstrained project scheduling "

K. H AASE
IIE Transactions • 1993

A branchandbound procedure for the multiple resourceconstrained project scheduling problem "

E. AND W. S. H ERROELEN D EMEULEMEESTER
Management Science • 1992

Scheduling of project networks by job assignment "

J. G RÜNEWALD
Management Science • 1991

An evaluation of microcomputerbased software packages for project management "

W. S. H ERROELEN
European Journal of Operational Research • 1990

Multi - project scheduling : Analysis of project performance " ,

T. A. F EO AND H. C. E LROD
IIE Transactions • 1985

A comparison of exact approaches for solving the multiple constrained resource , project scheduling problem "

C. R. R EEVES
Management Science • 1984

Heuristics for scheduling resourceconstrained projects : An experimental investigation "

E. W. D AVIS
Management Science • 1976

Similar Papers

Loading similar papers…