Cable Connection Scheme Optimization for Offshore Wind Farm Considering Wake Effect

@inproceedings{Hou2018CableCS,
  title={Cable Connection Scheme Optimization for Offshore Wind Farm Considering Wake Effect},
  author={Hou},
  year={2018}
}
  • Hou
  • Published 2018
: In order to reduce the levelised cost of energy (LCOE) of the offshore wind farm, many optimization works should be done to reduce the investment and increase the energy production. As one of the main expenses, the electrical system can take up more than 15% of the total investment while cable costs take a large proportion. In order to make a cost-effective wind farm, the cable connection layout should be optimized. This paper proposes a novel way for offshore wind farm cable connection… CONTINUE READING

References

Publications referenced by this paper.
SHOWING 1-10 OF 37 REFERENCES

Optimising the Design of Offshore Wind Farm Collection Networks

  • Proceedings of the 41st International Universities Power Engineering Conference
  • 2006
VIEW 4 EXCERPTS
HIGHLY INFLUENTIAL

Advancement of Jensen (Park) wake model

J. Choi, M. Shan
  • EWEA Conference, Wien, pp. 1-8, Feb. 2013.
  • 2013
VIEW 1 EXCERPT

Description of the DTU 10 MW reference wind turbine

C. Bak
  • DTU Wind Energy, Fredericia, Denmark, Jul. 2013.
  • 2013
VIEW 1 EXCERPT