Base stock versus WIP cap in single-stage make-to-stock production–inventory systems
@article{Liberopoulos2002BaseSV, title={Base stock versus WIP cap in single-stage make-to-stock production–inventory systems}, author={G. Liberopoulos and Y. Dallery}, journal={IIE Transactions}, year={2002}, volume={34}, pages={627-636} }
A single-stage production–inventory system produces parts in a make-to-stock mode, and unsatisfied demand is backordered. The system operates under a so-called base stock with WIP cap replenishment policy, which works as follows. Whenever the Work-In-Process (WIP) plus finished goods inventory falls below a specified level, called base stock, a replenishment order for the production of a new part is issued. If the WIP inventory is below a different specified level, called WIP cap, the order… Expand
14 Citations
Analysis of base-stock controlled production-inventory system using discrete-time queueing models
- Computer Science
- IEEE International Conference on Automation Science and Engineering, 2005.
- 2005
- 3
Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information
- Business
- 2005
- 54
- PDF
Comparative modelling of multi-stage production-inventory control policies with lot sizing
- Computer Science
- 2003
- 40
- PDF
Production Release Control: Paced, WIP-Based or Demand-Driven? Revisiting the Push/Pull and Make-to-Order/Make-to-Stock Distinctions
- Computer Science
- 2013
- 12
- PDF
Random Demand Satisfaction in Unreliable Production–Inventory–Customer Systems
- Economics, Computer Science
- Ann. Oper. Res.
- 2004
- 13
- PDF
Production control systems: Literature review, classification, and insights regarding practical application
- Engineering
- 2011
- 14
Performance comparison of multiple product kanban control systems
- Computer Science, Engineering
- Int. J. Prod. Res.
- 2018
- 10
References
SHOWING 1-10 OF 24 REFERENCES
Optimal Control of a Two-Station Tandem Production/Inventory System
- Mathematics, Computer Science
- Oper. Res.
- 1994
- 137
- Highly Influential
- PDF
An Inventory Model with Limited Production Capacity and Uncertain Demands II. The Discounted-Cost Criterion
- Mathematics, Computer Science
- Math. Oper. Res.
- 1986
- 337
- PDF
On the optimization of a single-stage generalized kanban control system in manufacturing
- Engineering
- Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation. ETFA'95
- 1995
- 9
Optimal Policies and Simulation-Based Optimization for Capacitated Production Inventory Systems
- Computer Science
- 1999
- 62
Comparison among three pull control policies: kanban, base stock, and generalized kanban
- Computer Science
- Ann. Oper. Res.
- 2000
- 74
- Highly Influential