BIM to field: Robotic total station and BIM for quality control

@inproceedings{Kang2012BIMTF,
  title={BIM to field: Robotic total station and BIM for quality control},
  author={Jasmine Kang and Jae Sung Lee and Adithya Subramanian and Vahid Faghihi},
  year={2012}
}
One of the reasons why some construction professionals are excited about BIM is because of its ability to visualize the installation of prefabricated building modules. As far as using BIM for facilitating the prefabrication process, we expect that all building components are installed correctly as indicated in the model. However, in many cases, building components such as cast-in-place concrete beams and columns are installed a little bit inaccurately because the formworks can be sagged or… CONTINUE READING