Automated Project Performance Control ( APPC ) of construction resources

@inproceedings{Navon2003AutomatedPP,
  title={Automated Project Performance Control ( APPC ) of construction resources},
  author={Ronie Navon},
  year={2003}
}
ABSRACT: Real-time control of on-site construction is a growing field still in its infancy. A model for automated control was developed, implemented and validated in the field, to verify if Project Performance Indicators (PPI) can be automatically measured and controlled. The concept behind this development is that indirect data – locations measured automatically at regular time intervals – can be collected automatically and converted into PPI using computerized algorithms. The model was… CONTINUE READING
Highly Cited
This paper has 35 citations. REVIEW CITATIONS

From This Paper

Figures, tables, and topics from this paper.

Citations

Publications citing this paper.
Showing 1-10 of 25 extracted citations

New approaches to specifying performance of construction machinery

Mária Kozlovská, Marek Krajňák, Lenka Sirochmanová, Renáta Bašková, Zuzana Struková
2015
View 1 Excerpt

References

Publications referenced by this paper.
Showing 1-5 of 5 references

Building Project Model Support for Automated Project Performance Control

R. Sacks, R. Navon, E. Goldschmidt
Journal of Computing in Civil Engineering • 2003

Can Labor Inputs be Measured and Controlled Automatically ?

R. Navon, E. Goldschmidt
2003

Field Experiments in Automated Monitoring of Road Construction

R. Navon, Y. Shpatnitsky
2003

ADCIC - Automatic Data Collection in Construction

C. A. Ciesielski Ciesielski
2000

“ Automated Construction FieldData Management System

B. G. McCullouch
Journal of Transportation Engineering • 1992

Similar Papers

Loading similar papers…