Assembly lead time reduction in a semiconductor capital equipment plant through improved material kitting

@inproceedings{Jain2014AssemblyLT,
  title={Assembly lead time reduction in a semiconductor capital equipment plant through improved material kitting},
  author={Sonam Jain},
  year={2014}
}
Manufacturing operations were studied at a semiconductor capital equipment manufacturing plant, with an aim to reduce the production time of their longest lead time module. Preliminary analysis was done by observing the assembly and test operations on the production floor, and material handling operations at the warehouse. Detailed time studies were then performed on the assembly and test processes, to establish baseline measurements and to gather in-depth information on the value added and non… CONTINUE READING