Aquifer Sampling Tube Results for Fiscal Year 2003

@inproceedings{Hartman2003AquiferST,
  title={Aquifer Sampling Tube Results for Fiscal Year 2003},
  author={Mary Jo Hartman and Robert E. Peterson},
  year={2003}
}
This report presents and discusses results of the fiscal year 2003 sampling event associated with aquifer tubes along the Columbia River in the northern Hanford Site. Aquifer tube data help define the extent of groundwater contamination near the river, determine vertical variations in contamination, monitor the performance of interim remedial actions near the river, and support impact studies. 

Similar Papers

References

Publications referenced by this paper.
SHOWING 1-10 OF 11 REFERENCES

Aquifer Sampling Tube Installation Completion Report: 100 Area and Hanford Townsite Shorelines

R. E. Peterson, J. V. Borghese, D. B. Erb.
  • BHI-01153, Rev. 0, prepared by CH2M HILL Hanford, Inc. for Bechtel Hanford, Inc., Richland, Washington.
  • 1998
VIEW 4 EXCERPTS
HIGHLY INFLUENTIAL

Description of Work for Installing Aquifer Sampling Tubes Along the 100 Area and Hanford Townsite Shorelines

R. E. Peterson, K. L. Singleton, J. V. Borghese.
  • BHI-01090, Rev. 0, prepared by CH2M HILL Hanford, Inc. for Bechtel Hanford, Inc., Richland, Washington.
  • 1997
VIEW 4 EXCERPTS
HIGHLY INFLUENTIAL

Aquifer Sampling Tubes Data Summary, Fall 2001

R. F. Raidl
  • BHI-01624, Rev. 0, prepared by CH2M HILL Hanford, Inc. for Bechtel Hanford, Inc., Richland, Washington.
  • 2002
VIEW 1 EXCERPT

Status of Aquifer Tubes as Determined During Fall 2002 Sampling Event AQT: Tube Name (HEIS

A Table
  • 2002

Aquifer Sampling Tubes Data Summary, Fall 2000

R. F. Raidl
  • BHI-01494, Rev. 0, prepared by CH2M HILL Hanford, Inc. for Bechtel Hanford, Inc., Richland, Washington.
  • 2001
VIEW 2 EXCERPTS

Chromium Concentrations in 100-H Operable Unit Pore Water Within Chinook Salmon Spawning Habitat of the Hanford Reach, Columbia River

S. J. Hope, R. E. Peterson.
  • BHI-00345, Rev. 0, prepared by CH2M HILL Hanford, Inc. for Bechtel Hanford, Inc., Richland, Washington.
  • 1996

Chromium in River Substrate Pore Water and Adjacent Groundwater: 100-D/DR Area, Hanford Site, Washington

S. J. Hope, R. E. Peterson.
  • BHI-00778, Rev. 0, prepared by CH2M HILL Hanford, Inc. for Bechtel Hanford, Inc., Richland, Washington.
  • 1996

Description of Work and Sampling and Analysis Plan for Pore Water Sampling at Groundwater-River Interface Adjacent to the 100-D/DR, 100-K, and 100-H Reactor Areas

S. J. Hope, R. E. Peterson.
  • BHI-00620, Rev. 0, prepared by CH2M HILL Hanford, Inc. for Bechtel Hanford, Inc., Richland, Washington.
  • 1996
VIEW 2 EXCERPTS

Guidance for the Data Quality Objectives Process

EPA.
  • EPA QA/G-4, U.S. Environmental Protection Agency, Washington, D.C.
  • 1994