Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment

Abstract

The classic approach in bulk power system restoration plans requires defining a black start unit and a crank path from the transmission system while integrating the use of the distribution system as a way of supporting the grid (switching, load reductions, shifting load, renewables and other restoration techniques). In short, to get as many customers… (More)

Cite this paper

@article{Mukherjee2015ApplyingTD, title={Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment}, author={Srijib Mukherjee}, journal={2015 IEEE Rural Electric Power Conference}, year={2015}, pages={103-105} }