Applying a Combined Chronometric- Simulation Method for Optimizing Operation Management in Construction

  • Stjepan Bezak, Jadranko Izetbegović
  • Published 2010

Abstract

The twenty-fi rst century poses numerous challenges to the national construction industry. On one level we need to develop a coherent classifi cation system if the concept of e-business is to be adopted on an operative level in the construction sector. On another level, companies are still engaging in larger and more complex projects that are increasingly diffi cult to plan and implement. At the same time, existing codes for construction operations are becoming less and less accurate, as they were created to serve large business systems that formerly existed under diff erent economic, technological, and societal conditions. Most of these large systems ceased to exist during the period of political transition. Although most of their know-how is preserved in the form of smaller, project-based organiApplying a Combined ChronometricSimulation Method for Optimizing Operation Management in Construction

4 Figures and Tables

Cite this paper

@inproceedings{Bezak2010ApplyingAC, title={Applying a Combined Chronometric- Simulation Method for Optimizing Operation Management in Construction}, author={Stjepan Bezak and Jadranko Izetbegovi{\'c}}, year={2010} }