An enhanced timetabling procedure for the no-wait job shop problem: a complete local search approach

@article{Framian2006AnET,
  title={An enhanced timetabling procedure for the no-wait job shop problem: a complete local search approach},
  author={Jose M. Frami{\~n}an and Christoph J. Schuster},
  journal={Computers & OR},
  year={2006},
  volume={33},
  pages={1200-1213}
}
Highly Cited
This paper has 42 citations. REVIEW CITATIONS

From This Paper

Topics from this paper.

Citations

Publications citing this paper.
Showing 1-10 of 17 extracted citations

An Effective Meta-Heuristic for No-Wait Job Shops to Minimize Makespan

IEEE Transactions on Automation Science and Engineering • 2012
View 4 Excerpts
Highly Influenced

A fast hybrid tabu search algorithm for the no-wait job shop problem

Computers & Industrial Engineering • 2009
View 4 Excerpts
Highly Influenced

Meta-heuristic for no-wait job shops with makespan minimization

2008 12th International Conference on Computer Supported Cooperative Work in Design • 2008
View 5 Excerpts
Highly Influenced

On Cyclic Job Shop Scheduling Problem

2018 IEEE 22nd International Conference on Intelligent Engineering Systems (INES) • 2018

A memory and variable neighborhood structure based complete local search for the no-wait job shop problem

Proceedings of the 2012 IEEE 16th International Conference on Computer Supported Cooperative Work in Design (CSCWD) • 2012
View 2 Excerpts