Adaptive Signal Scaling Driven Critical Path Modulation for Low Power Baseband OFDM Processors

@article{Nisar2008AdaptiveSS,
  title={Adaptive Signal Scaling Driven Critical Path Modulation for Low Power Baseband OFDM Processors},
  author={Muhammad Mudassar Nisar and Rajarajan Senguttuvan and Abhijit Chatterjee},
  journal={21st International Conference on VLSI Design (VLSID 2008)},
  year={2008},
  pages={71-76}
}
Modern wireless communication systems are designed for worst-case channel noise and interference conditions. This results in circuits that over-perform and consume more power than necessary most of the time when channel conditions are not worst-case. In this paper, we propose a power savings methodology that allows "graceful degradation" of baseband system performance when channel conditions are good without compromising overall bit-error rate. This adaptation is achieved by "dynamically… CONTINUE READING

Figures, Tables, Results, and Topics from this paper.

Key Quantitative Results

  • The proposed architecture can reduce power consumption in the baseband processor of an OFDM receiver by as much as 30%.

Citations

Publications citing this paper.
SHOWING 1-7 OF 7 CITATIONS

HERQULES: System level cross-layer design exploration for efficient energy-quality trade-offs

  • 2010 ACM/IEEE International Symposium on Low-Power Electronics and Design (ISLPED)
  • 2010
VIEW 4 EXCERPTS
CITES BACKGROUND & METHODS
HIGHLY INFLUENCED

Mixed Signal System Level Cross Layer Adaptation for Variability and Workload: A Pilot Study

  • 2011 IEEE 17th International Mixed-Signals, Sensors and Systems Test Workshop
  • 2011
VIEW 1 EXCERPT
CITES BACKGROUND

SNR-Aware Error Detection for Low-Power Discrete Wavelet Lifting Transform in JPEG 2000

  • 2009 24th IEEE International Symposium on Defect and Fault Tolerance in VLSI Systems
  • 2009
VIEW 1 EXCERPT
CITES METHODS

References

Publications referenced by this paper.
SHOWING 1-10 OF 11 REFERENCES

Tunable word length architecture for low power wireless OFDM demodulator

  • 2006 IEEE International Symposium on Circuits and Systems
  • 2006
VIEW 3 EXCERPTS
HIGHLY INFLUENTIAL

The simulation and evaluation of dynamic voltage scaling algorithms

  • Proceedings. 1998 International Symposium on Low Power Electronics and Design (IEEE Cat. No.98TH8379)
  • 1998

Search-based wordlength optimization for VLSI/DSP synthesis

  • Proceedings of 1994 IEEE Workshop on VLSI Signal Processing
  • 1994
VIEW 1 EXCERPT

Adaptive multistandard ciruits and systems for wireless communications ”

A. Tasic, W. A. Serdjin, J. R. Long
  • IEEE Circuits and Systems Magazine