ANALISIS SISTEM PENGAMAN ARUS LEBIH PADA PENYULANG ABANG DENGAN BEROPERASINYA PLTS PADA SALURAN DISTRIBUSI TEGANGAN LISTRIK 20 KV DI KARANGASEM

@inproceedings{Nurcahyadi2016ANALISISSP,
  title={ANALISIS SISTEM PENGAMAN ARUS LEBIH PADA PENYULANG ABANG DENGAN BEROPERASINYA PLTS PADA SALURAN DISTRIBUSI TEGANGAN LISTRIK 20 KV DI KARANGASEM},
  author={Made Benny Nurcahyadi and I Wayan Rinas and A. A Gede Maharta Pemayun},
  year={2016}
}
Abstract? F eeder Abang is one of the feeders in Bali which is a source of electrical energy coming from the substation Amlapura. Connection of new power generation units to the distribution network can increase the short-circuit current in the event of interference on the channel. Simulation of short circuit at the ETAP program is done with two simulations are simulated short circuit without the operation and after the operation of solar power generation. The results of the analysis of short… CONTINUE READING