A successful parallel implementation of NSGA-II on GPU for the energy dispatch problem on hydroelectric power plants

Abstract

Nowadays, hydraulic sources are responsible for most of the Brazil's energy production. Hydroelectric power plants (HPP) operators in Brazil usually distribute equally the total power required among the generator units available in the plant. However, studies show that this configuration does not guarantee that each generator unit operate close to its… (More)
DOI: 10.1109/CEC.2016.7744337

11 Figures and Tables

Topics

  • Presentations referencing similar topics