A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly

@article{Yin2004ARH,
  title={A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly},
  author={Xiao-Feng Yin and Tay Jin Chua and Feng-Yu Wang and Ming-Wei Liu and Tian Xiang Cai and Wen-Jing Yan and Chin-Soon Chong and Ju-Ping Zhu and Mei-Yoke Lam},
  journal={Int. J. Computer Integrated Manufacturing},
  year={2004},
  volume={17},
  pages={733-749}
}

From This Paper

Topics from this paper.

Citations

Publications citing this paper.
Showing 1-9 of 9 extracted citations

Simulation-Based Scheduling of Parallel Wire-Bonders with Limited Clamp&Paddles

Proceedings of the 2006 Winter Simulation Conference • 2006
View 3 Excerpts
Highly Influenced

Simulation optimization with GA and OCBA for semiconductor back-end assembly scheduling

2015 International Conference on Industrial Engineering and Operations Management (IEOM) • 2015
View 1 Excerpt

A GSPN-Based Approach to Stacked Chips Scheduling Problem

IEEE Transactions on Semiconductor Manufacturing • 2010
View 1 Excerpt

A workload control procedure for an FMC integrated in a job shop

Int. J. Computer Integrated Manufacturing • 2008
View 1 Excerpt

Scheduling Integrated Circuit Assembly Operations on Die Bonder

IEEE Transactions on Electronics Packaging Manufacturing • 2007
View 1 Excerpt

Similar Papers

Loading similar papers…