A principal components model of simulation structure

Abstract

It is often appropriate to analyze the output of a simulation study by looking at more than one measurement. In a traditional queuing model, it might be appropriate to look at three outputs:1. the average time through the system for a customer,2. the average number of balks per hour,3. the average utilization of the servers.These outputs measure different… (More)
DOI: 10.1145/76738.76807

Topics

1 Figure or Table

Slides referencing similar topics