A flexible MILP model for multiple-shift workforce planning under annualized hours

@article{Hertz2010AFM,
  title={A flexible MILP model for multiple-shift workforce planning under annualized hours},
  author={Alain Hertz and Nadia Lahrichi and Marino Widmer},
  journal={European Journal of Operational Research},
  year={2010},
  volume={200},
  pages={860-873}
}
a Département de mathématiques et de génie industriel, École Polytechnique de Montréal, C.P. 6079, succ. Centre-ville, Montréal, Québec, Canada H3C 3A7 b Département de mathématiques et de génie industriel, École Polytechnique de Montréal, GERAD 3000, chemin de la Côte-Sainte-Catherine, Montréal, Québec, Canada H3T 2A7 c Département d’informatique, Université de Fribourg, Bd de Pérolles 90, 1700 Fribourg, Switzerland 

From This Paper

Topics from this paper.

References

Publications referenced by this paper.
Showing 1-10 of 36 references

Flexible timetabling: A solution against the irregularity of the demand? in: EURO XV Conference

M. Widmer
Barcelona, Spain • 1997
View 11 Excerpts
Highly Influenced

10-hours single shift scheduling of hierarchical workforce

R. Namimhan, R. N. Burns
Working paper 94-37, Queen’s School of Business, 1994. A. Hertz et al. / European Journal of Operational Research 200 • 2010
View 1 Excerpt

Annualised hours: A real flexibility tool

A. Corominas, A. Lusa, R. Pastor
OR Insight 18 • 2005
View 1 Excerpt

Similar Papers

Loading similar papers…