A Study of Three-Period Ramp-Up Polytope

Abstract

The unit commitment (UC) problem is a very important problem in the power industry [1]. It seeks to minimize system-wide operational costs of power generators by providing an optimal schedule of power production while meet the demand and other technical constraints. By the combinatorial nature of the operational constraints, UC problem is difficult to solve… (More)