A Simulation Approach based Project Schedule Assessment

@inproceedings{Wang2019ASA,
  title={A Simulation Approach based Project Schedule Assessment},
  author={Ruiping Wang and Xu Li and Xiao Bing Song and Lei Dai and Yixin Li},
  booktitle={SIMULTECH},
  year={2019}
}
Traditional program evaluation and review technique lacks of complex task relation models. To tackle this, this paper proposes a project schedule risk assessment model based on extended Petri net, in which the characteristics of task duration, task overlap and sub-tasks are modelled. Based on the characteristics of concurrent iteration in product development schedule, the influence of each sub-task relationship on the simulation uncertainty is considered. In this case, several mathematical… 

Figures and Tables from this paper

References

SHOWING 1-10 OF 18 REFERENCES
Modeling impacts of process architecture on cost and schedule risk in product development
TLDR
This paper integrates several important characteristics of PD processes into a single model, highlighting the effects of varying process architecture and yielding several managerial insights, including: how rework cascades through a PD process, trading off cost and schedule risk, interface criticality, and occasions for iterative overlapping.
Modeling and Simulation of Textile Supply Chain through Colored Petri Nets
TLDR
The business process modeling and simulation of a textile supply chain using Colored Petri nets using a modularized model that takes into account both the source process and delivery logistics that exist between any two members of supply chain.
An Interactive Knowledge-Based CAD System For Mould Design in Injection Moulding Processes
This paper presents a practical prototype knowledge-based system, called IKMOULD, for mould design in the injection moulding process. It attempts to tackle the problem in a practical and integrative
Elementary Siphons of Petri Nets and Deadlock Control in FMS
TLDR
This work successfully applied Petri nets to deadlock analysis using the concept of elementary siphons, for design of supervisors of some supervisory control problems of FMS and simulation of Petri net tool with MATLAB.
Petri Nets—A Versatile Modeling Structure
TLDR
This paper reviews several published examples where Petri Nets were used in different circumstances such as estimating expected utilization of processing resources at steady state in open queueing networks, verifying computerized simulations and batch planning in textile industry.
A Parametric Colored Petri Net Model of a Switched Network
TLDR
A parametric Colored Petri net model of the switched Ethernet network with the tree-like topology is developed and topics of the steady-stable condition and the optimal choice of hardware are discussed.
...
...