A Preliminary Design, Economic and Energy Analysis, and Environmental Impact Assessment for a Seawater Cooling Project Naval Security Group Facilities at Winter Harbor, Maine.

@inproceedings{Hirshman1977APD,
  title={A Preliminary Design, Economic and Energy Analysis, and Environmental Impact Assessment for a Seawater Cooling Project Naval Security Group Facilities at Winter Harbor, Maine.},
  author={Jules Hirshman},
  year={1977}
}
Abstract : Preliminary design and analysis were performed for a proposed seawater air conditioning system for an existing U.S. Navy building at Corea, Maine. Two major options were examined. The first, to use seawater for the entire cooling load (100 tons); the second, to use additional cooling and dehumidification (enhancement) if necessary, when the seawater temperature is too high. A number of alternate enhancement methods were examined, and preliminary designs developed, including one for a… CONTINUE READING