A Flexible Model and a Hybrid Exact Method for Integrated Employee Timetabling and Production Scheduling

@inproceedings{Artigues2006AFM,
  title={A Flexible Model and a Hybrid Exact Method for Integrated Employee Timetabling and Production Scheduling},
  author={Christian Artigues and Michel Gendreau and Louis-Martin Rousseau},
  booktitle={PATAT},
  year={2006}
}
We propose a flexible model and several integer linear programming and constraint programming formulations for integrated employee timetabling and production scheduling problems. A hybrid constraint and linear programming exact method is designed to solve a basic integrated employee timetabling and job-shop scheduling problem for lexicographic minimization of makespan and labor costs. Preliminary computational experiments show the potential of this method. 1 Indroduction In production systems… CONTINUE READING
Highly Cited
This paper has 22 citations. REVIEW CITATIONS

From This Paper

Figures, tables, and topics from this paper.

Citations

Publications citing this paper.
Showing 1-7 of 7 extracted citations

Integrating truck scheduling and employee rostering in a cross-docking platform - an iterative approach

2015 International Conference on Industrial Engineering and Systems Management (IESM) • 2015
View 1 Excerpt

Optimization of integrated employee timetabling and Hybrid Job Shop Scheduling under time lag constraints

2014 International Conference on Control, Decision and Information Technologies (CoDIT) • 2014
View 1 Excerpt

References

Publications referenced by this paper.
Showing 1-10 of 27 references

Rousseau

F. Soumis, G. Pesant, L.-M
Gestion des horaires et affectation du personnel, • 2005

Springer Series in Operations Research and Financial Engineering

M. L. Pinedo. Planning, Scheduling in Manufacturing, Services
Springer, • 2005
View 1 Excerpt

Tabu search algorithms for a predictive and a reactive project scheduling problem

L.-E. Drezet, J.-C. Billaut
6th Metaheuristics International Conference, Vienna, Austria • 2005
View 1 Excerpt

and G

A. Häıt, P. Baptiste, N. Brauner
Finke. Approches intégrées à court terme, • 2005
View 2 Excerpts

editors

P. Baptiste, V. Giard, A. Häıt, F. Soumis
Gestion de production et ressources humaines. Presses Internationales Polytechnique • 2005

Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study

F. Huq, K. Cutright, C. Martin
Omega, 32:121–129 • 2004
View 1 Excerpt