Learn More
Taylor & Francis makes every effort to ensure the accuracy of all the information (the " Content ") contained in the publications on our platform. However, Taylor & Francis, our agents, and our licensors make no representations or warranties whatsoever as to the accuracy, completeness, or suitability for any purpose of the Content. Any opinions and views(More)
—Facing the intense competition, rising costs and ever changing consumer demands, many manufacturers switch to mass customization from mass manufacturing. The mass customization assembly line balancing problem arises to smooth the production and decrease the cost. However, the development towards mass customization has caused considerable increases in(More)
U-shaped assembly lines have been adopted in many manufacturing settings as part of just-in-time production principle. U-shaped line balancing problem (ULBP) is an extension of the traditional line balancing problem, in which tasks can be assigned from both sides of the precedence graph. In this paper, based on the integer programming formulation developed(More)
Assembly-line production systems are most commonly used for large quantity production. Assembly line balancing problem is one of the most important problems of preliminary design stage for flow-line production systems and is the important content of the course of operation management. improve the teaching effect of the content, according to the model of the(More)
The high prevalence of herpes simplex virus 2 (HSV-2) infections in humans necessitates the development of a safe and effective vaccine that will need to induce vigorous T-cell responses to control viral infection and transmission. We designed rAd-gD2, rAd-gD2ΔUL25, and rAd-ΔUL25 to investigate whether recombinant replication-defective adenoviruses vaccine(More)
  • 1