Yunali Wang

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
A rough mill is a manufacturing facility where lumber is processed into components to be used in assembling wood products such as windows and doors. A cut-list is a list of components of specific sizes and quantities, which are scheduled to processed at one time. Selection of suitable jags (loads if lumber) from candidates for a given cut-list is a complex(More)
This paper investigates the performance of a new node deployment model named Tri –Hexagon-Tiling for different types of scheduling in terms of energy consumption. This paper includes three types of scheduling methods by which we can allocate the time slots to the network nodes in order to assign them the periods of activity and inactivity. All the(More)
  • 1