Yuankun Zhang

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
—A new shift schedule with 4-parameter of construction vehicle was discussed and analyzed. The power train model of construction vehicle is vital to automatic shift and difficult to be expressed with mathematic model, while intelligent control is effective for solving the problem. A multi-layer back-propagation neural network (BPNN) model was proposed to(More)
  • 1