Youssef Harrath

  • Citations Per Year
Learn More
In this paper we consider a multiobjective job shop scheduling problem. The machines are subject to availability constraints that are due to preventive maintenance, machine breakdowns or tool replacement. Two optimization criteria were considered; the makespan for the jobs and the total cost for the maintenance activities. The job shop scheduling problem(More)
This paper studied the flow shop scheduling problem under machine availability constraints. The machines are subject to flexible preventive maintenance activities. The nonresumable scenario for the jobs was considered. That is, when a job is interrupted by an unavailability period of a machine it should be restarted from the beginning. The objective is to(More)
  • 1