a Department of Civil, Environmental and Architectural Engineering, Korea University, Anam-Dong, Seongbuk-gu, Seoul 136-713, Republic of Korea b Department of Architectural Engineering, Daegu University, Jillyang, Gyeongsan, Gyeongbuk 712-714, Republic of Korea c Department of Architectural Engineering, Mokpo National University, 61, Dorim-Ri,(More)
Accurate cost estimation at the early stage of a construction project is key factor in a project’s success. But it is difficult to quickly and accurately estimate construction costs at the planning stage, when drawings, documentation and the like are still incomplete. As such, various techniques have been applied to accurately estimate construction costs at(More)
a r t i c l e i n f o Temporary hoist planning is a key factor for successful project completion in a high-rise building construction. Inadequate plans for hoists in the early stages of a project can cause problems such as failing to hoist resources as required or leaving hoists idle. There are two existing approaches, simple formulas and simulation(More)
The objective of this research is to quantitatively measure and compare the environmental load and construction cost of different structural frame types. Construction cost also accounts for the costs of CO₂ emissions of input materials. The choice of structural frame type is a major consideration in construction, as this element represents about 33% of(More)
Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually since it won a contract for a nuclear power plant construction project in the United Arab Emirates in 2009. However, time and monetary resources(More)
The rapid inflow of foreign construction workers caused the reduction of labor productivity in the construction industry due to communication problems and cultural differences. This may lead to shortage of productivity and quality reduction. The cultural differences and motivation factors of foreign construction workers must be considered for effective and(More)
Appropriate selection of a formwork system is a crucial factor in successfully completing any high-rise building construction project. However, in practice, the selection of an appropriate formwork system has depended mainly on the intuitive and subjective opinion of practitioners with restricted experience. Therefore, in this study, a decision support(More)
In recent years, there has been an increasing interest in the adoption of emerging ubiquitous sensor network (USN) technologies for instrumentation within a variety of sustainability systems. USN is emerging as a sensing paradigm that is being newly considered by the sustainability management field as an alternative to traditional tethered monitoring(More)
Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but(More)
This study was motivated by the view that cultural differences should be taken into account in the management of Korean and foreign workers on construction sites. We identify motivation factors that are influenced by the cultural differences of the laborers, and their effects on productivity. Based on the results of a preliminary survey of field technicians(More)