Yinlong Lu

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
The Beijing Radioactive Ion-Beam Facility (BRIF) being constructed at CIAE consists of a 100 MeV high intensity cyclotron CYCIAE-100, an isotope separator on line (ISOL) system with a mass resolution of 20000, and a superconducting booster (SCB). The construction of the main building started on April 28, 2011 and the roof was sealed on Jan. 16, 2012. The(More)
The way of matching the beam from an external ion source to the central region of the cyclotron CYCIAE-100 is presented in this article. The transverse acceptances of the central region were calculated, which provided the matching ellipse parameter requirements to the injection transport optics design. The optics of the injection line was simulated using(More)
At CIAE, a 100 MeV H(-) cyclotron (CYCIAE-100) is under design and construction. A central region model (CRM) cyclotron was built for various experimental verifications for the CYCIAE-100 project and for research and development of high current injection to accelerate milliampere H(-) beam. The H(-) multicusp source built in 2003 has been improved recently(More)
  • 1