Because of different refining route of every charge, it's difficult to make a static scheduling plan for steelmaking-refining-continuous casting (SRCC) production. There are many types of disturbances that upset the scheduling plan including processing time variation, temperature variation, quality variation, flow speed variation of cater, machine failures,(More)
The quality of rolling unit planning affects production cost, product quality and productivity. The existing research methods are not applied in practice because the surface quality requirement of the hot rolling coil and the integrated production with two-strand caster and hot rolling machine are neglected, and the width of each waiting produced slab(More)