Learn More
China's thermal-power-led power structure has caused serious environmental pollution problems. The Energy Development Eleventh Five-year Plan of China proposes that China should reduce the emissions of the main pollutants and optimize the power structure. In this paper, we build the programming model to optimize the electric power structure and constraint(More)
Considering the features of long term load forecasting are complicated, this paper proposes a generic neural network model that is able to adapt to and learn from amount of non-linear or imprecise rules, so it is a model with highly robustness. For avoiding the inflexibility of the generic neural network itself, many experiences and opinions of experts are(More)
  • 1