Yana Su

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
Project contractors often need to rent resources to execute their projects, and the clients often set up bonus-penalty structure (BP-structure) at the deadline of the project to encourage the contractors in fulfilling the project on time. In this paper, we introduce BP-structure and flexible resource-constraints (i.e. resource renting) into traditional(More)
In the industrial cluster, there is a supply chain network which has the competitive advantage of integrating enterprise resources and core abilities. In the supply chain network, this paper proposes two evolutionary game models of horizontal symmetrical and vertical asymmetric based on strong ties and weak ties of cluster enterprises cooperative behavior,(More)
For the purpose of estimating the cycle and working hours of complex projects which often involve a number of iterations, an improved parallel iteration model based on the representation of design structure matrix is used in this paper. First this model is applied to calculate the duration and working hours of tasks in the coupled block through the method(More)
R&D dynamic alliance is the modular organization which is highly flexible. It reduces the cost, shortens the period and improves the ability of competition through the integration of core competencies and resources. We make a modular decomposition of the cooperative enterprises in dynamic alliance according to their functions, and transform each(More)
  • 1