Learn More
Now a day the transmission lines are operated under the heavily stressed condition, hence there is risk of the consequent voltage instability. This paper proposes a particle swarm optimization method for solving optimal reactive power planning (ORPP) problem using Thyristor Controlled Series Compensator (TCSC). The proposed PSO have been applied for the(More)
  • 1