Xiangheng Fu

Learn More
Pneumatic system operation status and problems were analyzed in the industrial production site; Considering the 24 hours as a time unit, the feature of compressed air consumption was studied every 20 seconds in 24 hours in the industrial production site. Then, presenting a forecasting method, which is workable and the overall mean in line with air(More)
Miner enterprises are often equipped with general-purpose machine tools, which are not in stream-line and hard to control by network. The paper puts forward an information management system to manage the work site automatically. With networking technology, which integrating the agreement of TCP/IP and 485, the information of the tools can be gathered(More)
  • 1