Weidong Lei

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
—This paper addresses the single-track multi-hoist cyclic scheduling problem. In most existing studies, loaded hoist moves are implicitly or explicitly assumed to start and end within the same cycle. We give a counterexample to demonstrate that the optimal solution obtained with such an assumption is not necessarily the best one among all feasible solutions(More)
  • 1