Tomoari Maruyama

Learn More
Current 20 GeV/c photoproduction experiments at the SLAC Hybrid Facility require a decision to take a picture within 150-300 us after the beam pulse. A charged track trigger is provided by a 168/E processor which finds tracks in a downstream PWC system. To meet trigger time requirements the 168/E SNOOP module CAMAC interface is augmented by a CAMAC(More)
  • 1