In this paper a multicriteria scheduling problem with sequence-dependent setup times on a single machine is considered. The objective function of the problem is minimization of the weighted sum of total completion time, maximum tardiness and maximum earliness. An integer programming model is developed for the problem which belongs to NP-hard class. Only(More)
In this paper a single machine scheduling problem to minimize tardy jobs is considered. To increase the reality of the problem, deterioration and learning effect is added to. Beside, according to Inherent uncertainty in processing times, they are considered to be normally distributed. To find an appropriate solution, four existing models are extended and(More)