Author pages are created from data sourced from our academic publisher partnerships and public sources.
- Publications
- Influence
Share This Author
Integrated analysis of quality and production logistics performance in manufacturing lines
- M. Colledani, T. Tolio
- Business
- 15 January 2011
This paper presents an analytical method for evaluating the performance of production systems, jointly considering in a unique framework quality and production logistics performance measures. In the…
A Review of Different Approaches to the FMS Loading Problem
- A. Grieco, Q. Semeraro, T. Tolio
- Business
- 1 October 2001
Loading in flexible manufacturing systems (FMSs) is affected by the characteristics of the FMS under analysis, by the type of plant where the FMS is introduced, and by the production planning…
Design and management of manufacturing systems for production quality
- M. Colledani, T. Tolio, J. Váncza
- Business
- 2014
SPECIES—Co-evolution of products, processes and production systems
- T. Tolio, D. Ceglarek, J. Váncza
- Business
- 2010
Analysis of two-machine lines with multiple failure modes
- T. Tolio, A. Matta, S. Gershwin
- Business
- 1 January 2002
This paper presents an analytical method for evaluating the performance of production lines with a finite buffer and two unreliable machines. Unlike in earlier papers, each machine can fail in more…
Performance evaluation of production lines with finite buffer capacity producing two different products
- M. Colledani, A. Matta, T. Tolio
- BusinessOR Spectr.
- 1 June 2005
TLDR
Integrated quality, production logistics and maintenance analysis of multi-stage asynchronous manufacturing systems with degrading machines
- M. Colledani, T. Tolio
- Business
- 2012
A two-stage stochastic programming project scheduling approach to production planning
- A. Alfieri, T. Tolio, M. Urgo
- Business
- 1 September 2012
In engineering-to-order (ETO) or manufacturing-to-order (MTO) systems producing highly customized items, the high level of customization, together with long flow times, forces the production plan to…
...
...