Stephanie Gonterman

We don’t have enough information about this author to calculate their statistics. If you think this is an error let us know.
Learn More
The Greyhound Lines Dallas Maintenance Facility was congested during peak operating periods. A stochastic model of this facility was developed to determine the resource requirements needed to provide adequate service during periods of peak demand. The structure of the simulation model is described. A representative sensitivity analysis is presented to(More)
  • 1