In the present work, first steps of an extensive experimental study carried out on two vertical micropiles in alluvial silty soil are presented. One of the vertical micropiles is injected throughout valves a-manchèttes placed along the steel core of the shaft, while the other one is grouted with a unique global injection. Both of them are(More)
This paper describes some notable aspects regarding the dynamic monitoring planned for the Chiaravalle viaduct, linking SS76 and airport of Ancona in Falconara, in Italy. The viaduct is 875 m long and consists of four r.c. kinematic chains separated by joints. The deck is constituted by three beams supported by column bent piers constituted by two circular(More)