S. K. Bidhar

Learn More
Risk-Informed In-Service Inspection (RI-ISI) aims at prioritizing the components for inspection within the permissible risk level thereby avoiding unnecessary inspections. The two main factors that go into the prioritization of components are failure frequency and the consequence of the failure of these components. The study has been focused on piping(More)
A methodology to evaluate the effect of gas pores on fatigue life of aluminium die casts is proposed in terms of stress concentration factor. As observed in many fatigue tests, it is not always the case that the largest sized pore initiates fatigue crack. So we need to consider the interactions between the gas pores based on their configuration, shapes and(More)
  • 1