Reza Kazemi

Learn More
The United States Nuclear Regulatory Commission (USNRC) relies on Probabilistic Risk Assessment (PRA) as one of the main pillars of its risk-informed regulatory and oversight functions. In 2011, the South Texas Project Nuclear Operating Company (STPNOC) initiated a risk-informed project to resolve Generic Safety Issue 191 (GSI-191), which is related to the(More)
INTRODUCTION In this paper, the meaning of " risk-informed " is discussed in the context of power reactor design and operation and is related to the NRC guidance for an acceptable method to assess the nature and impact of changes using risk information [1]. As an application, risk-informed decision making is explained for the resolution of Generic Safety(More)
In this project, a pattern reconfigurable simple 2 patch array antenna has been designed and implemented to operate at a fixed frequency of 2.4 GHz for beam scanning purpose. Proposed antenna operates at three different modes in which the radiation pattern steers 0 0 , ±30 0 with respect to the antenna broadside. In this paper, a different approach has been(More)