Radhouan Bouabda

Learn More
This paper addresses to the permutation flowline manufacturing cell with sequence dependent family setup times problem. The objective is to minimize the makespan criterion. We propose a cooperative approach including a genetic algorithm and a branch and bound procedure. The latter is probabilistically integrated in the genetic algorithm in order to enhance(More)
  • 1